PROJECTS

North East Link Project (2020 - 2021)​

5.5km dual 140 OD conduit and cable install from Doncaster Zone Substation to Bullenn for United Energy and North East Link Project.

Healesville - Koo Wee Rup Road Duplication (2022)​

The relocation of the overhead powerlines to underground powerlines for the road duplication project.

Mont Albert Level Crossing Removal (2022)​

The installation of temporary power and communication conduit under the rail for the Level Crossing Removal Project.

Hallam Level Crossing Removal Project (2021)​

Underground installation of 2x22KV feeder and 66KV feeder for the level crossing removal project.

Puckapunyal Army Base Fire Main Replacement (2021 - 2022)​

The renewal of 5km of watermains via boring in the Puckapunyal Army Base.

Dublin Road Level Crossing Removal (2023)

CSR bores for level crossing removal